Skip to content

Week 2 (Sept. 19-22)

September 26, 2011

Attended Leica 1950 cryostat demo (assembled last week). Worked on anesthesia machine (examined features, magnetic switch within pin for holding ventilator needed replacing, took apart and reassembled with repaired switch, tested). Operated lathe to machine aluminum pole inserts to hold IV poles on surgical beds. Diagnosed pressure fault on anesthesia machine. Reviewed inventory and work/time assignment with TMS database. Examined bladder scanner and its operation. Repaired broken bed footboard (plastic clips snapped and needed glue repair). Examined 2-stroke eco motor online. Replaced bulbs on microscopes. Attended lecture “Imaging: The Big Picture” by Courtney Allen (Virginia Mason) at the WSBA Symposium on Saturday (NSCC campus).

Advertisements

From → Uncategorized

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: